Arc-On Productivity

Calculate your shop's Operating Factor—the percentage of a shift a welder spends actually pulling the trigger and depositing metal.

Welder Arc-On Time & Productivity Calculator Time-Based Calculation -->
Shift Details
Hours
Mins
hrs
mins
Time read directly from machine software or stopwatch.
Shift Details
Hours
Mins
lbs
lbs/hr
Ready to Analyze

Enter shift details to view productivity metrics.

Shift Breakdown
Gross Operating Factor
--
%
Based on total shift
Net Operating Factor

--

%
Excluding scheduled breaks
Time Allocation 8.0 Hours Total
Arc
Prep/Wait
Breaks
Arc-On: 0h 0m
Prep/Fit: 0h 0m
Breaks: 0h 0m
Industry Benchmarks
  • 10 - 20%: Custom fabrication, heavy fit-up, job shop.
  • 20 - 30%: Standard manual production welding.
  • 40 - 50%: Semi-automated (sub-arc, mechanized carriages).
  • 60 - 80%: Fully automated robotic welding cells.