Deposition Estimator

Calculate the actual weight of filler metal deposited into a joint per hour, factoring in the efficiency loss from spatter, slag, and fumes.

High Waste (30%) Efficiency: 95% Perfect (100%)
Wire / Electrode Parameters
For Stick (SMAW), enter the burn-off rate.
Hourly Rates (100% Arc-On Time)
Net Weld Deposited

Deposition Rate & Efficiency Calculator

lbs/hr
Actually enters the joint
Spatter & Slag Loss

--

lbs/hr
Lost to waste
Total Wire Melted (Purchased): 0.0 lbs/hr
The Cost of Efficiency

A higher gross melt-off rate doesn't always equal a faster weld. If you use a low-efficiency process, you are paying for wire that ends up as floor sweepings.

Typical Process Efficiencies
Process Avg. Efficiency Primary Loss
SAW (Sub-Arc)99%Negligible
GMAW (Solid Wire)95 - 98%Spatter / Fume
MCAW (Metal-Core)90 - 95%Spatter / Fume
FCAW (Flux-Core)80 - 85%Slag / Fume
SMAW (Stick)55 - 65%Slag / Stubs
Purchasing Impact

To deposit 100 lbs of weld metal using Flux-Core (82% eff), you must purchase and melt 122 lbs of wire. Using Solid MIG (95% eff), you only need to purchase 105 lbs.

Note: These figures assume 100% "Arc-On" time. To find actual shift production, multiply the Net Deposition by your operator's Operating Factor (typically 20% to 40%).