How the Workshop Power Calculator Works
Every machine draws a current that depends on its power and the supply voltage. Add up everything that runs at the same time and compare it with the smallest rating in the chain: the plug and its fuse, the extension lead's cable, and the circuit breaker. Then check the start-up surge and how much voltage the lead loses on the way.
In the UK a 13 A plug (BS 1363) is the limit for anything plugged into a normal socket, whatever the circuit behind it. At 230 V that is about 3 kW. A 4-way extension lead does not give you four times as much: all four sockets share its one 13 A plug.
The Formulas
Worked Example
- Saw: 1800 ÷ (230 × 0.95) = 8.2 A. Vac: 1400 ÷ (230 × 0.95) = 6.4 A. Lights: 100 ÷ (230 × 0.9) = 0.5 A.
- Total running: 15.1 A. That is more than one 13 A plug or a 13 A lead can carry, even though the 32 A ring could. Run the vac from a different socket on its own lead, or use a vac with a power take-off socket and keep the total under 13 A.
- Peak when the saw starts: 15.1 + (2.5 − 1) × 8.2 = 27.5 A for a moment, under 3 × 32 A, so the breaker should not trip.
- Voltage drop at 15.1 A: 2 × 25 × 0.0156 × 1.2 × 15.1 = 14.2 V, about 6.2 %. With the saw alone (8.2 A) it is 7.7 V, 3.4 %, which is fine.
Practical Tips
- Unwind cable reels completely for heaters, compressors, saws and welders. A wound reel traps heat; its coiled rating is printed on it and is far lower than the uncoiled one. Reels made to BS EN 61242 have a thermal cut-out, but do not rely on it.
- Do not daisy-chain extension leads or plug a 4-way into another 4-way. The first plug still carries everything.
- Use the shortest, thickest lead you have. 2.5 mm² cable loses about half the voltage of 1.25 mm² over the same length.
- Compressors that trip breakers often start better on a shorter, thicker lead, or with a longer air hose instead of a longer extension lead.
- Welders: check your machine's duty cycle at the amps you weld at with the duty cycle calculator, and look up starting settings in the hobby welder settings guide.
- Running cost: the electricity cost calculator turns these watts into pence per job. Three-phase machines on a single-phase supply are covered by the phase converter sizer.
- New sockets or a garage supply should be designed and fitted by a registered electrician. In England and Wales a new circuit is notifiable work under Part P of the Building Regulations.
Frequently Asked Questions
Machine figures, power factors and start-up multipliers are typical values, not data for your machine. Cable resistances and ratings are approximate for copper flexible cable. This page is a guide to whether a load is reasonable, not a substitute for electrical design or an installation check by a qualified electrician.